Hospital del Mar

2016

Project: Extension of the Hospital del Mar in Barcelona

Area: 18.000 m²

Performed tasks: Integrated BIM modelling ( architecture,structure and MEP)

Images

 

© 2019 A3D CONSULTING INTEGRATED BIM SOLUTIONS, S.L.

Montcada i Reixac, Barcelona | bim@a3d.es | (+34) 935 752 977